The "Inspection Date" shown on reports, dashboards, and query filtering criteria can now be changed by users with "Overwrite/Delete" permissions. This inspection date change was requested so that reports and dashboards seen by customers reflect the correct date inspections were performed if the date the inspection was added to FTQ360 is not the date the actual inspection was carried out.
To change the "Inspection Date, you will edit "Inspection created on" date in the blue header at the top of the inspection.
Instructions
1. In the blue header of the inspection, click on the "Inspection created on" date.
2. Select the date from the popup calendar date picker.
3. Click Save.
Date changes with the new date are recorded on activity log and the revised date will then appear as the inspection date where applicable.
Comments
0 comments
Please sign in to leave a comment.