PlannedCan we get a time sheet on FTQ? It is done on paper and a photo taken of it. And texted in or emailed in. All our crews are working over a 50 mile radius. They have about 5 different yards. So it will make life a lot better for us. Right now it’s a battle getting them in. And started using the checksheets for our QC reports. Its makes sense that out timesheet can be done off the same app.
Korey Curley
PAR Electrical Contractors, Inc.

-
Developers reviewed this request and believe a child-checkpoint could be added to the Dynamic Matrix that could identify the field as "Add Type." It would need to instruct whether to add the row or add the column. The sum could be placed at the end of the row or the bottom of the column.
Several checklist and checkpoint updates are planned for later in the year, and this request could be included with the updates.
-