You can assign an asset or equipment from the project to another project. The assignment history tracks all transfers in and out of projects. This enables full documentation of the asset lifecycle when coupled with shipping and receiving condition inspections as well as periodic maintenance and service reports.
Instructions
1. Go to Setup>Assets/Equipment Setup
2. Select the asset or equipment
3. Chose the new project from the drop down menu under the Project column.
Comments
0 comments
Please sign in to leave a comment.